Strata & Office Plumbing in Western Sydney, Documented Properly.

Risers, plant-room hot water, accessible bathrooms across floors, end-of-trip facilities and tenant fit-out coordination. The difference in strata work is not the plumbing, it is the paperwork and knowing whose cost it is before anyone starts. We attend with certificates of currency already on file, a SWMS where the site needs one, and a report the committee can actually read.

§02 / The question that holds up every job

Lot owner or owners corporation?

Almost every delayed strata plumbing job is delayed by this, not by the plumbing. Here is the general rule, and the honest limits of it.

Short answer

The owners corporation is responsible for repairing and maintaining common property. The lot owner is responsible for what is inside their lot. That duty on the owners corporation sits in section 106 of the Strata Schemes Management Act 2015 (NSW).

For plumbing, the practical dividing line is usually where the pipe sits and how many lots it serves. Pipes running inside common property walls, floors or ceilings are generally common property, and so is the main stopcock to a unit. Pipework inside the lot serving only that lot, and the fixtures themselves, are generally the owner’s. A pipe serving more than one lot is far more likely to be common property than one serving a single unit.

The general rule is not the answer for your building. The strata plan and the by-laws decide it, and a common property rights by-law can move a duty onto a lot owner that would otherwise sit with the owners corporation. NSW publishes a common property memorandum that many schemes adopt, which sets the split out item by item. Check those three documents before anyone commits to a cost.

General position only. Your strata plan, by-laws and any common property memorandum the scheme has adopted override all of it.
What has failed Usually whose What decides it
Pipe inside a common property wall or floor slab Owners corporation Location. Inside common property structure is generally common property.
The main stopcock to a unit Owners corporation Listed as a common property item in the NSW common property memorandum.
A stack or riser serving several lots Owners corporation Serves more than one lot, so it is shared infrastructure.
Tap, mixer, toilet or basin inside the lot Lot owner Fixtures within the lot are the owner’s, not the scheme’s.
Pipework inside the lot serving only that lot Lot owner Location, plus how many lots it serves.
Hot water unit dedicated to one apartment Usually lot owner Depends where it sits. A plant-room unit serving the building is a different answer entirely.
Waterproofing membrane in a lot bathroom Commonly disputed Often ends up common property as original building structure, and it is not a plumbing trade in any case.
§03 / Scope

What we look after in a building.

Residential strata, commercial office floors and mixed-use. The work splits into scheduled maintenance, reactive callouts, and the fit-out work that lands whenever a tenant changes.

Riser and stack maintenance

Shared stacks are where one lot’s problem becomes everyone’s. Scheduled jetting of the main lines, inspection openings kept accessible and marked, and a record of what was cleared and when, so a recurring stack has a history rather than a rumour.

Plant-room hot water

Central hot water plant serving multiple lots or floors. Tempering valve checks, circulation and return faults, relief valve replacement, and the failures that show up as no hot water on the top floor and nowhere else.

Accessible bathrooms across floors

Grab rail fixings into the right substrate, pan set-outs and heights that meet the standard, and tempered water where it is required. Getting this wrong is an access compliance problem, not only a plumbing one.

End-of-trip facilities

Showers, changing rooms and the drainage that goes with them. Heavy morning peak loads, high fixture density, and a hot water demand curve that looks nothing like a residential building.

Tenant fit-out coordination

Rough-in and fit-off for an incoming tenancy, capping off what the outgoing one left behind, and making sure the new tea point or bathroom is connected to something that can carry it. We work as the plumbing lead alongside the builder.

Backflow compliance

Buildings with a commercial kitchen, a cooling tower or an irrigation system usually own a testable backflow device, and often nobody on site knows it exists. Annual testing and lodgement with the water authority. More on our backflow page.

§04 / Working with the manager

What a strata manager actually needs from a plumber.

Mostly not plumbing. Mostly the ability to attend without three phone calls, and paperwork that survives a committee meeting.

1

Access sorted once.

Key or fob arrangements, after-hours access, loading dock and lift booking rules, and who the on-site contact is. We set this up when the account starts rather than rediscovering it on every attendance.

2

Attend and establish whose it is.

Before the repair, we work out whether the fault sits in common property or in the lot, and we put that in writing. That determination is what lets a manager raise the right work order against the right party without guessing.

3

Make safe, then quote the repair.

Stop the damage on the first attendance. Anything beyond making safe gets quoted before it proceeds, because a committee generally cannot approve a spend it has not seen a number for.

4

Report with photographs.

What was found, what was done, what remains, and images. Written so it can be forwarded to an owner or tabled at a meeting without translation.

5

Invoice the right party.

Split correctly where a job crosses the boundary, referenced to the lot or the common property item, so it reconciles against the work order rather than starting an argument three weeks later.

§05 / Compliance

The paperwork that comes as standard.

What you get

NSW plumbing and gas licence 309265C, current, on the public record and quotable in a committee minute. Certificates of currency for public liability, supplied before we attend rather than after someone asks. A SWMS where the site or the work requires one.

Compliance certificates are issued where the job calls for them, including a Gas Compliance Certificate on any gasfitting work, which in NSW must be lodged through the BCNSW eCert portal within five business days. An emailed PDF of a paper form is no longer lodgement.

Twelve month workmanship guarantee on parts and labour. Where a job crosses the common property boundary, the invoice is split against the correct party rather than issued as one line for someone else to unpick.

§06 / Strata & office FAQ

What managers and committees ask us.

Direct answers from a licensed NSW plumber. General information about the usual position, not legal advice about your scheme.

Who pays for a burst pipe in a strata unit, the owner or the owners corporation?
It usually turns on where the pipe sits and how many lots it serves. Pipes inside common property walls, floors or ceilings are generally common property and therefore the owners corporation’s, and the same applies to the main stopcock to a unit. Pipework inside the lot serving only that lot is generally the owner’s. The duty on the owners corporation to maintain common property is section 106 of the Strata Schemes Management Act 2015. Your strata plan, by-laws and any common property memorandum the scheme has adopted are what actually decide it, so check those before committing to a cost.
Can you tell us whose responsibility it is before you do the repair?
Yes, and we put it in writing as a matter of course. We attend, establish whether the fault sits in common property or in the lot, make safe, and report on it before the repair proceeds. That determination is what lets the manager raise the work order against the right party. What we cannot do is interpret your by-laws for you, and where a scheme has a common property rights by-law that shifts a duty, that is a question for the manager or the scheme’s lawyer rather than the plumber.
Do you carry insurance and provide certificates of currency?
Yes, and we send them before we attend rather than after someone asks. Public liability certificates of currency, NSW plumbing and gas licence 309265C which is current and on the public record, and a SWMS where the site or the work calls for one. If your building requires contractor induction or a specific compliance portal, tell us at the start of the account and we will work through it once.
Our building has a device we were told needs annual testing. What is that?
Almost certainly a backflow prevention device. Buildings with a commercial kitchen, a cooling tower, an irrigation system or a fire service usually have one, and higher hazard devices have to be tested annually by a plumber holding backflow accreditation, with the results lodged with the water authority. A lot of owners corporations do not know the building owns one until a notice arrives. We test, and we lodge on your behalf.
One apartment has no hot water but the rest of the building is fine.
If the building runs central hot water plant, a single affected lot usually points at that lot’s tempering valve, an isolating valve, or the branch serving it, rather than at the plant. If several lots on one line are affected, or it is the top floor, that points at circulation or return instead. The distinction matters because it usually also decides whether the cost sits with the lot or with the owners corporation.
Do you do the waterproofing on a leaking bathroom?
No. Waterproofing is a separate trade and we do not hold it out as ours. What we do is determine whether the water is coming from a pipe or from a failed membrane, which is the question that decides which trade you need and often which party carries the cost. If it is the membrane we say so and refer it on. Membrane failures in a lot bathroom are commonly disputed between owner and scheme, so a written determination is worth having early.
Can you hold a standing account for a portfolio of buildings?
Yes, and it works better than job-by-job for both sides. Access arrangements get recorded once per site, reporting comes through in a consistent format, and recurring problems build a history rather than being rediscovered by whoever attends. We are a workshop rather than a national contractor, so we are honest about how many sites we can carry properly. Ask and we will tell you straight whether we have capacity for yours.
Sources
§07 / Standing accounts

Strata Plumbing in Penrith: One Plumber Who Knows Your Building.

Tell us the site, the access arrangement and what keeps recurring. We will tell you honestly whether we have the capacity to look after it properly, and what a standing account would cover.

InsuranceCoC on file
Licence309265C
ReportingPhoto each visit
Service areaWestern Sydney

Standing accounts for strata managers

If you manage multiple properties in Western Sydney or the Penrith LGA, ask us about a standing account. One set of contact details, access arrangements logged once, consistent reporting format across every building, and invoices that reconcile against your work orders without follow-up calls.

Call 0412 045 854 or visit our contact page to set one up.

Who is responsible for plumbing in a strata building in NSW?

In NSW, the owners corporation is responsible for plumbing on common property — including pipes in common walls, floors, and main stopcocks — under section 106 of the Strata Schemes Management Act 2015. Fixtures and pipework inside a lot serving only that lot are generally the lot owner’s responsibility. Your strata plan, by-laws, and any common property memorandum adopted by the scheme determine the exact split.